431
Loop 1A Loop 1B Loop 1 Loop 2A Loop 2B Loop 2 Loop 3
Appendix 2: Utilities Master Plan
2030
Master Plan - Campus Electrical Load by Loop
2029
2028
2027
at 100%) 2026 2025
(Existing loads 2024 Year
2023
2022
2021
2020
2019
2018
450 400 350 300 250 Amps at 13.2 kV 200 150 100 50 0