Page 14 - The EDGE Spring 2022
P. 14

School Construction: Which Method Is Best?
        CONTINUED FROM PAGE 10







































        Myth 2: The builder stifles creativity.                 •  Efficiencies  through  collaboration  between
        Truth:  Alternative delivery methods offer owners          planners, designers and builders, including cost
        a  way  to  receive  the  benefits  of  the  ingenuity  and   savings and scheduling benefits.
        creative collaboration by the designer and builder.  •  Reduced  financial  risk  due  to  project  budget
        By working together, the end result is a project that      being established early on.
        balances creative design with factors that impact the
        project’s overall quality, cost and schedule.           Nationwide, 44% of construction projects are being
                                                                constructed using the alternative delivery method of
        Myth 3: The owner loses control.                        design-build and 35% are using CMAR compared
        Truth: With the owner as a key part of the core project  with only 19% using the traditional design-bid-build
        team, the owner’s rep plays a crucial role and is often  process (source: FMI, 2021).
        tasked  with  increased  speed  of  decision-making  to
        accommodate the compression of the design and  There  is  no  “one-size-fits-all”  prescription  when
        construction cycle. A benefit to alternative delivery  it comes to construction delivery methods. Each
        models is that owners are not bogged down by project  education project is unique and often has a complex
        details and rely instead on the core team of experts to  set of circumstances to consider before selecting a
        resolve issues together and involve the owner when  delivery method.
        decisions need to be made.


        Overall, the primary benefits of alternative delivery   Mike Gonzalez is vice president of the Education Building
        methods include:                                        Group for McCarthy Building Companies’ Southwest
        •  Early cost and schedule certainty; speed-to-         region. He can be reached at: mgonzalez@mccarthy.com
            market is a critical factor for selecting an        or (480) 449-4700
            alternative project delivery method.




                                                                                                      |
        14                                                                               THE EDGE   SPRING 2022
   9   10   11   12   13   14   15   16   17   18   19