Page 68 - Bernardon Response to RFP-CRISP Bldg 709
P. 68

laboratory/office experience









           Spring House Innovation Park –  Building 4
           Lower Gwynedd, Pennsylvania
           Spring House Innovation Park is a $5.8M reuse development of a former
           1960s-era central utility plant. The multi-tenant business and research campus
           features built-to-suit laboratories, state-of-the-art R&D facilities and office space.
           Structural design services were provided for renovation to the existing two-story
           building for re-use as office and laboratory space. The project scope included:
           •   Addition of new entrance canopies
           •   New stair and elevator shafts within the existing building foot print
           •   Infill of existing stair, elevator and mechanical shafts throughout the
               building                                                                        Spring House Innovation Park
           •   Expansion of existing high roof to convert low roof area into interior space.
           Spring House Innovation Park –  Building 8
           Lower Gwynedd, Pennsylvania
           Structural design  and construction administration  services were provided for
           renovations and additions to the existing building. The project scope included:
           •   Installation of a new elevator in the existing floor plan.   The opening
               occurred full height of the building and full height CMU walls. The elevator
               necessitated a new opening at the roof level for elevator clearance possible
               underpinning of the existing elevator pit.
           •   Installation of a new opening in the existing second floor slab located in the
               building corner adjacent to the existing stair opening.
           •   New entrance element on the corner adjacent to the proposed first floor lobby
               including new exterior columns and roof canopy.
           •   Analysis of the existing building and creation of new openings for the support
               of new rooftop mechanical units requiring steel framing to re-support the         SHIP Building 8 Renovation
               existing concrete framing.
           •   Coordination and detailing required for the removal and replacement of the
               exterior building walls.  The masonry wall was removed and new storefront
               walls were installed near the exterior column location.
           •   Coordination of miscellaneous modifications to the existing stairs openings as
               well as infill of existing small floor openings.


           Spring House Innovation Park –  Building 6
           Lower Gwynedd, Pennsylvania
           Structural design services  and construction administration  were provided for
           renovations and additions to the existing building. The project scope included:

           •   Removal of second-floor framing to create a new open lobby space.
           •   Installation of a new exterior canopy and vestibule at the main entrance.
           •   Removal of existing walls for installation of a new exterior curtain wall
               structure.
           •   Removal of concrete curb at the roof structure and installation of new roof-
               top mechanical units.
           •   New floor infill in the existing second-floor mechanical plenum.
           •   Installation of new exterior wall panels to be attached to the existing
               structure.
           •   Installation of a new elevator shaft and pit in the existing footprint.

                                 Wilmington, Delaware   |   Wayne, Pennsylvania   |   www.MacIntoshEng.com