Page 72 - Bernardon Response to RFP-CRISP Bldg 709
P. 72
DuPont Facility Experience
DuPont Experimental Station
Wilmington, Delaware
DuPont Experimental Station – E304 Pipe and Duct Rack Design
DuPont Experimental Station – Absorber #4 Demolition
DuPont Experimental Station – Rigging Analysis
DuPont Experimental Station - Building 304B Off-Rack Pipe Support Design
DuPont Compressor Lifting Attachment & Squirrel Cage Lifting Attachment Design
DuPont Experimental Station – 24” Butterfly Valve Lifting Devices
DuPont Experimental Station – E315 VFD Rigging
DuPont Experimental Station – Chiller 11 Pump Valve Replacement Rigging Steel
DuPont Experimental Station – Trench Pipe Support for Condenser Water Return
DuPont Experimental Station – Building E315 Stair Design Review
DuPont Experimental Station – Access Platform for Chiller 6
DuPont Experimental Station Pipe Trench – Framing and Saddle Analysis
DuPont Experimental Station Building 302 – Rooftop Duct Rack Design
DuPont Experimental Station - ESL Thermal Treatment
DuPont Experimental Station – Incinerator Modifications
DuPont Experimental Station – E315 Boiler #3
DuPont Experimental Station – Absorber 5 Demolition
A.I. Dupont Hospital
Wilmington, Delaware
A.I. Dupont Cath/Lab/O.R. Renovations
A.I. Dupont MRI Addition
A.I. DuPont High Risk Delivery Unit
A.I. DuPont - Occupational Therapy
A.I. DuPont Hospital Emergency Generator Concrete Pad Design
A.I. DuPont Chestnut Run
Wilmington, Delaware
DuPont Chestnut Run - Dryer Rig Support
Wilmington, Delaware | Wayne, Pennsylvania | www.MacIntoshEng.com