DuPont Facility Experience










           DuPont Experimental Station
           Wilmington, Delaware
           DuPont Experimental Station – E304 Pipe and Duct Rack Design

           DuPont Experimental Station – Absorber #4 Demolition
           DuPont Experimental Station – Rigging Analysis

           DuPont Experimental Station - Building 304B Off-Rack Pipe Support Design
           DuPont Compressor Lifting Attachment & Squirrel Cage Lifting Attachment Design

           DuPont Experimental Station – 24” Butterfly Valve Lifting Devices
           DuPont Experimental Station – E315 VFD Rigging

           DuPont Experimental Station – Chiller 11 Pump Valve Replacement Rigging Steel
           DuPont Experimental Station – Trench Pipe Support for Condenser Water Return

           DuPont Experimental Station – Building E315 Stair Design Review
           DuPont Experimental Station – Access Platform for Chiller 6

           DuPont Experimental Station Pipe Trench – Framing and Saddle Analysis
           DuPont Experimental Station Building 302 – Rooftop Duct Rack Design

           DuPont Experimental Station - ESL Thermal Treatment
           DuPont Experimental Station – Incinerator Modifications

           DuPont Experimental Station – E315 Boiler #3
           DuPont Experimental Station – Absorber 5 Demolition




           A.I. Dupont Hospital
           Wilmington, Delaware
           A.I. Dupont Cath/Lab/O.R. Renovations
           A.I. Dupont MRI Addition

           A.I. DuPont High Risk Delivery Unit
           A.I. DuPont - Occupational Therapy

           A.I. DuPont Hospital Emergency Generator Concrete Pad Design


           A.I. DuPont Chestnut Run
           Wilmington, Delaware
           DuPont Chestnut Run - Dryer Rig Support