Page 103 - Bernardon Response to RFP-Chestnut Run Campus Master Plan
P. 103
Roy Ziegler, P.L.S.
Project Manager – Land Surveys
Roy Ziegler is a registered Professional Land
R RO OY Y Z ZI IE EG GL LE ER R, , P P. .L L. .S S. . Surveyor in the states of Maryland and Delaware
with an expertise that come from 36 years of
Survey Department Manager comprehensive land surveying experience. As Survey
YEARS OF EXPERIENCE: Department Manager, Mr. Ziegler is in responsible
Landmark Science & Engineering: 11 charge and works closely with the engineers,
Other Firms: 25 survey/CADD technician, crew chiefs and field staff
to provide accurate data and timely surveys.
EDUCATION:
A.A.S. Engineering Technology, Delaware Mr. Ziegler is experienced in providing perimeter and topographic surveys,
Technical Community College route surveys (vertical and horizontal control); traversing; establishing rights
of way (ROW); setting monuments; highway topography; cross section;
ACTIVE REGISTRATION: hazardous waste topography; aerial survey; pipelines; refinery survey; lot
Professional Land Surveyor stakeout; mortgage survey; and all types of construction layout work. He has
Delaware No. S6-0000603 (1994) performed work in right of ways for Amtrak, CSX, and Norfolk Southern and is
Maryland No.11006 (2009) familiar with all Right to Enter (RTE) permits and all training and safety
Certified: OSHA 29 CFR 1910.120 – 8 Hour credential requirements. He has the knowledge that comes from having
HAZWOPER Refresher Course performed every aspect of land surveying, from field work, technician/CAD
design, survey coordination, project management, to business ownership.
PROFESSIONAL MEMBERSHIPS:
Delaware Association of Surveyors (DAS) KEY PROJECT EXPERIENCE
DuPont Chestnut Run Plaza Bldg. 715, New Castle County, DE
Survey Manager/Coordinator responsible for Demolition Survey for Bldg. 715.
DuPont Chestnut Run Plaza - Project Renaissance, Wilmington, DE
Chief of Crews, responsible for topographic and perimeter surveys and construction stakeout for a new office building and
associated steam line, gas line, roadway, utilities, and storm drainage for the new facility.
FMC Stine Building 320 Expansion, City of Newark, DE
Project Survey Manager, responsible for initial boundary and topographic/existing conditions survey prior to design, prepared
as-built check surveys as proposed building was being constructed.
Stine-Haskell Greenhouse and Research Facility, City of Newark, DE
Project Survey Manager, responsible for initial boundary and topographic/existing conditions survey prior to design,
construction layout/stakeout, prepared post-construction site as-built surveys.
Stine-Haskell Steam Line, City of Newark, DE
Project Survey Manager, responsible for initial boundary and topographic/existing conditions survey prior to design,
construction layout/stakeout, prepared post-construction site as-built surveys as pipeline was being constructed.
Stine-Haskell Sanitary Sewer As-Built, City of Newark, DE
Project Survey Manager, responsible for sanitary sewer as-built throughout project area.
DuPont Pencader/Vespel Products Nitrogen Line Survey – Newark, DE
Project Survey Manager, responsible for nitrogen line survey. (2015)
DuPont Tralee Park Storage Building, Parcel 4-A
Survey Manager/Coordinator, responsible for surveys data required.
DuPont Chemours
Survey Manager/Coordinator, responsible for construction stakeout.