Page 10 - Bernardon Proposal for Design Services Revised
P. 10

www.bernardon.com













                   and apartment / condo level;                     goal will be to finalize the architectural relationships,
                  ■  Prepare unit plans of each dwelling unit type for the   determine structural implications, and coordinate the
                   hotel guestrooms and apartment / condo units;    HVAC, plumbing, and electrical needs for the entire
                  ■  Prepare elevations of all building facades to describe   building.
                   the exterior image, as well as materials;
                  ■  Provide two (2) preliminary building sections;  A 50% Design Development submission of the hotel
                  ■  Provide one (1) preliminary typical wall section;  portion of the project to Hyatt Hotels for franchise
                  ■  Structural  engineering  Schematic  Design     review and approval is expected during this phase.  As
                   deliverables per Exhibit B;                      part of this submission, we will prepare responses to
                  ■  MEPFP engineering Schematic Design deliverables   Hyatt comments and redmarks following review with
                   per Exhibit C;                                   the Ownership team.
                  ■  Numeric  calculations  of  GSF,  NRSF,  and  unit  mix
                   matrix;                                          The following is a tentative list of drawings which will be
                  ■  Review the requirements of applicable building   provided at the conclusion of this phase for your mixed-
                   codes  including  zoning  ordinances,  the  2018   use building:
                   International Building Code (IBC), The Fair Housing
                   Act (FHA), and the Americans with Disabilities Act     ■  Parking garage floor plans;
                   (ADA) accessibility guidelines; and                ■  First floor plan;
                  ■  We will meet to present our initial design concepts     ■  Second floor plan;
                   and  modify  the  designs  as  directed  to  obtain     ■  Third floor plan;
                   approval of the building design.                   ■  Typical apartment/condo upper floor plan;
                                                                      ■  All hotel floor plans;
               Site plans and land development plans will be prepared     ■  Enlarged plans and details of each hotel guestrooms,
               by the civil engineer.  We will review the site plans and   including prototype details;
               assist with the coordination of the site improvement     ■  Enlarged apartment/condo unit plans and details;
               requirements.                                          ■  Roof plans;
                                                                      ■  Exterior elevations;
               Once we have received approval and authorization from     ■  Building sections;
               JBAS Realty for our Schematic Design phase services, we
               will proceed to Phase V, Design Development.

               Phase V – Design Development
               The solutions created during the Schematic Design
               process shall form the base information to proceed with
               a more refined set of Design Development documents.
               Ongoing design review comments will be incorporated
               into the design as this phase proceeds.  Prior to our
               meetings, we will assess the ramifications of the
               proposed changes or improvements as they relate to
               structural, code, systems, finishes/furnishings, and cost
               implications.  We will prepare documents for preliminary
               pricing and distribute to you for review and critique.  The


               BERNARDON | Response to Request for Proposal
               JBAS Realty, LLC | New Multi-Use Development in Scranton, PA | July 8, 2022, revised July 27, 2023  Page 4
   5   6   7   8   9   10   11   12   13   14   15