Page 53 - Bernardon-Limestone Medical Center RFP Response
P. 53

Main Line Health

                - Pharmacy USP

                Upgrades -
                Multiple

                Locations









                 PENNSYLVANIA





                                               Main Line Health has identified pharmacies in twelve (12) locations that require
                                               upgrades to comply with USP 797 and USP 800.  USP 800 updates USP 797
                                               (sterile preparation regulations) and addresses hazardous drug manufacturing,
                                               including such key elements as compounding, preparing the drugs, storage,
                                               transport, product storage, compounding, preparation, and administration of
                                               parenteral and non-parenteral products. The goal of the recommendations
                                               within USP 800 is to minimize or eliminate occupational exposure to hazardous
                                               medications.

                                               USP 800 applies to compounding pharmacies, hospital pharmacies, and medical
                                               centers.

                                               DEDC was selected to survey and assess the mechanical and electrical systems
                                               serving the pharmacies at twelve (12) Main Line Health locations for compliance
                                               with UPS 800.

                                                          o   Lankenau
                                                          o   Riddle
                                                          o   Paoli Hospital
                                                          o   Bryn Mawr Hospital
                                                          o   Bryn Mawr Rehab
                                                          o   Exton
                                                          o   Collegeville
                                                          o   Riddle



                                               The goal of the survey and assessment is to determine the required upgrades to
                                               achieve compliance. Once the required MEP upgrades were determined we
                                               presented our findings to the project team. After review of our findings and
                                               recommendations to the project team, DEDC completed construction documents
                                               for each location. We also provided assistance during bidding and construction.