From August 21 to September 15, 2022, LRG-33 was used to remove mill scale on the southern (12 km) and north-
ern (12 km) main lines of the Dhaka metro, for a total length of approximately 24 km. Over the specified length of
24 km, 47 MiniProf observations (left and right separately) were recorded at various locations. LRG-33 operated at a
normal and sustained grinding speed of 9 km/h on the Dhaka Metro track, using a UIC 60E1 profile and with the rail
surface hardened to BHN 350 to 390.
The machine achieved an average depth of cut, measured at the rail head center, of 0.077 mm (W1) for the south-
bound and northbound mainline, well within the tolerance range of 0.04 mm to 0.1 mm. The profile of the ground
rail section was not deformed in any way during grinding to remove mill scale.
The team successfully completed both objectives and the removal of the burn damage on the ramp, which has in-
creased the customer's confidence in the grinding applications.
Acknowledgement
Special thanks to the management of Loram, USA for their constant support and efforts on this DMTCL project. We are also
very grateful to the representatives of L & T for their on-site support which made this project a great success.
Special Mention of key Personnel:
LORAM Team VIPL Team
Charles Rudeen Rajinder Sehgal Subhadeep Sarkar
Brian Schroeder Dr. J. S. Binoj Somnath Bhattacherjee
Brian Giop Vikas Singh Rajan Handa
Anthony Mohs Gajendra Pandey Pushap Raj
Jon Behrens Daman Uppal Vijesh Yogesh Shah
Brandon Riddering Shubhranshu Kunal Venket Rao
Md. Sohrab Dinkar Gupta
Page 7 DECEMBER 2022