urbanrail                    ®                                 Installation Instructions





        Post Installation (UREP, URCP, URLP, URSP)















        Identify where you will be   With proper under-blocking   At this stage, DO NOT   Repeat these steps for your
        placing your posts.       installed fasten your post   fasten your fasteners all the   remaining posts.
                                  in place with only 1 to 2   way into your base. Leave
        Mark from the edge of the
        deck 1″-2″ inward. This mark   fasteners.           fasteners loose, to allow posts   TIP: Position and install
        is where you will place the   It is important you check with   to tilt enough for top rails to be   all corner posts first, then
        edge of your post base.   your local Building Depart-  installed into top rail sleeves   measure and center all
                                  ment for approved fastener   of posts.                 line posts.
            IMPORTANT             sizes for the deck you are
            Post Spacing          building.
            should not exceed
            6ft for glass and 8ft
            for picket railing.

        Pre-assembled Panel Installation (URTBP8)















         Measure the distance between   For Wall brackets or angle   Mark and cut rails.   Install gap cover on bottom
         the posts at the base of the   brackets, cut rails to length   Use a handsaw or non-   rail sleeves of posts before
         post.                     so that rails will be fully   ferrous aluminum cutting   installing the bottom rails.
                                   seated in rail sleeves on
         When installing rails in posts,                     blade.
         deduct 1/2” from this measure-  brackets (no ½” deduction).  Always wear safety
         ment for cut length, to allow for                       glasses when cutting
         inside welds of post sleeves.













         Drill holes every 16” - 24” in   Make sure to drill through   Drop the bottom rail into the   Level posts, then
         underside of bottom rails for   bottom and middle channel.  bottom rail sleeves, then   fully secure fasteners
         water drainage, using a 3/16”                       tilt the top of posts to allow   attaching posts to
         diameter drill bit.          Be careful not to drill   top rails to slide into top rail   substrate.
                                      through top spacer     sleeves.