Page 86 - Regal ideas Binder_USA_v3
P. 86
urbanrail ® Installation Instructions
Pre-assembled Panel Installation (URTBP6 & URTBP8) continued...
Once post bases are tightly Repeat step for bottom rails. Fasten top rails to posts and Fasten bottom rails to posts
secured, double check that brackets using URCS50 and brackets using URCS50
post is plumb with a level screws. screws.
and pre-drill through welded
post brackets and top rails. Warning: Be careful not
Use a 1/8″ (3mm) drill bit size to over-torque screws into
when using URCS50 screws. aluminum post.
Leg Support Installation (URLS)
Final step, install the URLS leg Measure distance between Slide support leg under Pre-drill using 1/8” (3mm)
support. posts and find center. bottom rail. drill bit size and fasten sup-
port leg into bottom rail using
Use bottom rail support legs URCS50 screws.
for all rails that span more
than 48”. Repeat these steps for your
remaining sections.
Post Base Cover Installation (URBC)
Complete your installation by Place URBC covers on each Connect together by locking Post base covers will cover
giving your railing a finished side of post. the pieces together. lag bolts and give your
look with the URBC Post project a clean finished look.
Base Covers. TIP: Add some silicone
to top of bolt heads and
push base cover onto
silicone to secure in place.
regalideas.com/urbanrail | Toll Free: 1-800-819-4344 | Fax: 1-604-952-4291 | email: sales@regalideas.com 2
V2