Page 87 - Regal ideas Binder_USA_v3
P. 87
urbanrail ® Installation Instructions
Top and Bottom Rail Installation (URTB6)
To install rails, measure the For Wall brackets or angle Mark and cut rails. Slide top rail into welded post
distance between the posts brackets, cut rails to length so Use a handsaw or non- bracket.
at the base of the post. De- that rails will be fully seated in ferrous aluminum cutting
duct 1/2” from this measure- rail sleeves on brackets (no blade.
ment and cut rails. ½” deduction).
Always wear safety
glasses when cutting
Slide bottom rail into bottom Using a level, plumb all While leveling posts, install Once post bases are tightly
welded post bracket. posts. remaining fasteners into post secured, double check that
base to tightly secure using post is plumb with a level
structural URSL fasteners. and attach top rails to welded
post brackets with URCS-50
screws.
TIP: Pre-drill using 1/8”
(3mm) drill bit.
Fasten bottom rails to posts Drill 3/16” diameter weep Use bottom rail support legs Complete your installation by
using a URCS-50 screw. holes in bottom rail every for all rails that span more giving your railing a finished
16″ – 24” to allow any water/ than 48”. look with the URBC Post Base
TIP: Pre-drill using 1/8” moisture to escape during (See Instructions Page 2) Covers.
(3mm) drill bit. the various seasons. (See Instructions Page 2)
regalideas.com/urbanrail | Toll Free: 1-800-819-4344 | Fax: 1-604-952-4291 | email: sales@regalideas.com 3
V2