Page 423 - Manual-of-Operation-Merged
P. 423

CvSU MANUAL OF OPERATIONS
                   ______________________________________________________________________
                                                                                                         86

                          a.       Procurement System
                                 To  a  large  extent,  the  cost  and  availability  of  supplies  and
                          materials  determine  the  salability  and  profitability  of  finished
                          products.  Thus,  an  IGP  must  have  a  procurement  system  that
                          possesses the following characteristics:


                                         ▪  It must be reliable and fast.
                                         ▪  It must be cost and quality sensitive.

                                 Speedy determination of where to purchase what items in what
                          quantities require that we do away with the usual government

                          bidding and awarding procedures. For capital expenditure, however,
                          the Manual suggests that the usual government procedure should be
                          observed.  The  same  shall  likewise  apply  to  purchase  of  semi-
                          expendable purchases except when these are urgently needed by the
                          IGP.

                                 In  SUCs  with  many  but  small-scale  IGPs  it  would  be  cost-
                          effective if centralized body within the facilitative staff will handle all
                          purchases  based  on  the  approved  production  levels.  However,  in
                          SUCs with several medium-to large-IGPs, a decentralized procurement
                          body under the Project Manager will probably be more efficient.

                                 Whether       the    procurement        system      is   centralized      or
                          decentralized, its financial requirement will be made in the form of a
                          cash advance to be liquidated as soon as the supplies and materials
                          are produced. The amount of cash advance will depend on the type of
                          IGP and production level. The Imprest Fund System shall be used as
                          the  standard  procedure  in  granting  cash  advance.  A  checker  or
                          quality control inspector will also have to be assigned from within the
                          facilitative staff to ensure that quality requirements are complied with.

                                 Aside from the quality aspect, the checker or inspector will also
                          determine the appropriateness of the quantity and to a certain extent,
                          the  price  of  the  items  produced  particularly  in  purchases  made
                          outside  of  the  planned  production  level.  In  no  case  will  purchased
                          items  be  admitted  into  production  without  passing  through  the
                          checker or inspector.