Page 122 - MRF Training TJ MRF Manual Version 5 22042024 final April 24_Neat
P. 122

PPE Required.




                                                     Compulsory
                                                                                              Optional or
                                                                                 Optional or
                         Compulsory    Compulsory     High Vis    Compulsory    as instructed  as instructed
                                                      Overalls





                    Pace Makers and Work Equipment



            There are various pieces of equipment on TJ sites that use electro-magnets to separate
            fragments of metal from other material.

            If you use a Pacemaker you must bring this to the attention of the management at
            your induction so that control measures can be put in place. We can then advise you
            of where this electro-magnetic equipment is situated and what to look out for.




































                                                  Page 121 of 181

                                                                                  Reviewed April 2024
   117   118   119   120   121   122   123   124   125   126   127