Materials Recycling Facility (MRF)

            The MRF consists of conveyors, trommel,
            screens  and  wind  shifters  and  all
            operators that use this equipment  must
            have  received  training.  To  avoid  any
            accidents      involving     operators,     the
            following Safe System of Work must be
            adhered to;

                    Staff will wear all the necessary PPE
                    provided and instructed.
                    Follow  all  safety  instructions  given
                    and not put themselves at risk.

                    Ensure  that  they  make  eye  contact
                    before entering the danger zone of any
                    machine  or  vehicle  within  the  working
                    environment.



            Daily Checks



                 Complete a daily walk around safety                                     Check for people nearby and
               inspection of your the MRF that will include     Observe all conveyors are running centrally   continue with start up procedure
                checking fluid levels before completing a   Check that the pre-start alarm and    e-stops   without rips or tears.  if safe to do so.
                 defect sheet-any defects should be   are working                        Pedestrians  must be 5 meters
                reported to your manager and rectified as           Are bearings ok and greased.  away or  standing on the picking
                       necessary.                                                          station before starting

            Basic Start Up Procedure




                                                                                           Before ensure that all
                                        Advise over the radio that   Confirm that all staff are
                        Start Work                                                          bystanders are a safe
                                        the plant is about to start      clear
                                                                                          distance away 5 metres.




            Basic Shut down Procedure




                                                                                              Climb down from the
                                                       Walk around the
              Alert the operator                                                              machine using three
               loading the plant                      plant and inspect it   Switch off Engine,   points of contact
               that the plant is   Switch off Plant   to ensure that it is   remove keys and    whilst using the
                  stopping                            not damaged or in   lock the machine.    handrails and steps
                                                       need of repair.
                                                                                                   provided.