Operating Aggregate Crushers (IMPACT/JAW)

                    Operative  will  be  externally  trained  and
                    competent  and  have  read  the  RA’s  and
                    SSW’s  relevant  to  the  job  they  are
                    undertaking.

                    Staff will wear all the necessary PPE provided
                    and instructed.

                    Follow all safety instructions given and not put
                    themselves at risk.
                    Ensure  that  they  make  eye  contact  before
                    entering  the  danger  zone  of  any  machine  or
                    vehicle within the working environment.

            Daily Checks


               Complete a daily walk around safety                                      Check for people nearby and
               inspection of your machine that will              Observe all conveyors are running   continue with start up
                include checking fluid levels before   Check that the movement  alarm and   centrally without rips or tears.  procedure if safe to do so.
                 completing a defect sheet-any   e stops areworking
                defects should be reported to your                Are bearings ok and greased.  Pedestrians  must be 5
                manager and rectified as necessary.                                     meters away before starting


            Basic Start Up Procedure







                                         Start engine on slow idle for                      Before starting the engine,
                        Start Work       5minutes before full power is   Confirm that all levers and   ensure that all bystanders are a
                                                                    switches are in neutral
                                               engaged.                                    safe distance away 5 metres.








            Clearing Blockages




                                                                Allow the engine to             Climb down from the
                               Remove  the key from            idle for 5 minutes to            machine using three
               Ensure machine is in a   any other mobile        cool the engine and   Ensure you have the   points of contact whilst
               safe area away from   plant nearby and   Return all control   turbo.  keys in yourpocket   using the handrails and
                 other machines   ensure the manager   levers to neutral  Remove  the Key.  and deal with the   steps provided.
                  operating    of the site is aware of                             blockage
                                 the situation.                 Review  section 7 of           Check for nearby people
                                                                   this SSW                      before re-starting.