1. PRELIMINARIES
7. Water Supply
• The Contractor is responsible for providing the clean water required in
connection with the works.
• Clean water shall be free from mud, organic materials, and
chemical compounds.
8. Storage Facilities
• The Contractor shall provide proper facilities for the storage and
protection of soil, rock, and water samples.
9. Utilities Detection
• To detect and mark all utilities and services within 1.0m radius of each
test locations.
• The Contractor shall be fully responsible for any damage caused.