1. PRELIMINARIES





                 7. Water Supply

                      •     The Contractor is responsible for providing the clean water required in

                            connection with the works.

                      • Clean water shall be free from mud, organic materials, and

                           chemical compounds.


                 8. Storage Facilities

                      •     The Contractor shall provide proper facilities for the storage and

                            protection of soil, rock, and water samples.


                 9. Utilities Detection

                      •     To detect and mark all utilities and services within 1.0m radius of each

                            test locations.


                      •     The Contractor shall be fully responsible for any damage caused.