Page 30 - PENYIASATAN TAPAK
P. 30
1. PRELIMINARIES
13. Laboratory testing facilities
• Soil and rock samples shall be tested at the laboratory test
approved by the S.O.
• The Contractor shall submit the profile of the proposed
laboratory for the approval of S.O.
• Classification teston the disturbed samples, particularly Particle
Size Distribution (PSD) is allowed to be conducted at the
laboratory with Skim Akreditasi Makmal Malaysia (SAMM)
accreditation only.
14. Traffic & Safety Management
• Traffic and safety management requirements in accordance with
Arahan Teknik (Jalan) ATJ 2C/85 shall be comply for the site
located on the road.