1. PRELIMINARIES




                 13. Laboratory testing facilities


                      •       Soil and rock samples shall be tested at the laboratory test

                              approved by the S.O.

                      •       The Contractor shall submit the profile of the proposed

                              laboratory for the approval of S.O.

                      •       Classification teston the disturbed samples, particularly Particle

                              Size Distribution (PSD) is allowed to be conducted at the

                              laboratory with Skim Akreditasi Makmal Malaysia (SAMM)

                              accreditation only.

                 14. Traffic & Safety Management

                      •       Traffic and safety management requirements in accordance with

                              Arahan Teknik (Jalan) ATJ 2C/85 shall be comply for the site

                              located on the road.