WORK AT HEIGHT WALK ON CEILING
● Service penetration through ceiling panels or grids need to be marked on site and
communicated through Jacobs supervision;
● Modification of ceiling components will only be made by Linder
personnel;
● Unauthorized cutting of any ceiling component will result in disciplinary
procedures and possible removal from site;
● Maintain good housekeeping at all times, cleaning equipment should
include HEPA vacuum cleaners;
● Flammable materials must not to be stored on the ceiling;
● All work equipment and work clothing must be clean and suitable for a
clean room environment;
● Short term DAILY storage of materials on the ceiling must not exceed
2
2
2
150 kg/m or 330lbs/m or 1.5 kn.m ;
● All packaging must be removed ahead of material being raised on to the
ceiling and placed on protective material.