RENOVATION, FIGURE 1 NARC 1 progress map 2017-18
RENOVATION, Chapelhill Ruthven Fettercairn National AGI Renovation
Aberdeen
Crathes
Auchenblae
Campaign - Batch 1
Tigerton
Kirriemuir
Construction Progress
Meikleour
RENOVATION Gargunnock Crieff Denny Bathgate UK Map
Machany
Braco
Key
Site Works Underway
Site Works Commencing within 1-2 Months
Site Works Commencing in 2-6 Months
Site Works Complete
Version: 7
Issue Date: 4 th July 2018
Key Contact: Chris Bates
christopher.j.bates@nationalgrid.com
Chris Bates, Lead Project Manager,
discusses the National Grid AGI Renovation Campaign
id you know the National on regulatory network output
Grid (NG) gas transmission measures (NOM) targets Haunton Elworth Rockland St. Peter
Swanton Abbott
Hardingham
system (NTS) delivers over ■ A small in-house engineering and Alrewas Austrey Roudham Heath Felthorpe
four times the amount of innovation focused delivery team. Stratford Rugby Great Wilbraham
Eathorpe
Churchover Tee/MJ
Leamington
D energy than the UK Our new delivery team started in Compressor/MJ Hardwick Slapton Steppingley Whitwell Cambridge Compressor
Wormington
Duxford
electricity network? 2017, delivering wide ranging Didcot Matching Green
Rye House
The gas network is forecast to construction works on 90 sites across Barrington Ilchester Nuffield
continue supplying the vast majority the UK, varying from full site demolition Kenn (South) Michelmersh
of energy for another 30 years, and re-building to modern industry Mappowder
forming the backbone of the UK’s specifications, to innovatively replacing
energy supply as we transition to a targeted parts of a system beyond -
greener future. The current cost to economical repair such as actuators,
the UK householder for the gas pipework, valves and pipe supports. million standard cubic metres of
transmission system is around £9 per At the campaign’s peak, over 250 natural gas from being emitted to the
year. The NTS has an average asset site operatives from our four contract atmosphere, allowing NARC access to
age of over 40 years, hence the case partners (J Murphy & Sons, Fastflow rebuild and refurbish the network.
for major national engineering Energy Services, Bilfinger and JN Over 150 P/11 and P/20 Inspections
programmes to ensure its health. Bentley) and two design partners were performed, with 50+ of these
The National Above Ground (Premtech and Mott MacDonald) resulting in damage assessments
Installation Renovation Campaign worked on 90 sites UK wide, including ranging from severe to superficial.
(NARC) consists of £150 million of five compressor stations. And over 420 network output
asset health works designed to Over 500km of the NTS was placed measures are currently in flight
change and revolutionise the way under outage, isolated and the gas (200+ delivered to date, more than
National Grid Gas Transmission recompressed back into the system any other delivery unit).
projects are delivered, increase for re-use. This saved around 16.9 The campaign also includes the
delivery volumes and drastically
improve efficiency and delivery.
The campaign is based upon: FIGURE 2 In 2017-18 NARC successfully delivered these projects
■ Acceleration and lean efficiency;
from concept to site delivery inside
12 months, prioritising only the
most critical works.
■ Renovation means reviving and
making assets sound again as new
for the 21st century, using
innovation, economics and whole
life design. In other words, it’s not
simply a full rebuild.
■ Utilising network outages efficiently
to access the most vulnerable parts
of our UK network.
■ Boosting UK engineering resources
and capability, i.e., competent and
trained professionals.
■ Standardisation of work scope,
modular off-site build and economies
of scale.
■ Resolving work backlog and deliver