Page 161 - ADMINISTRATIVE MANUAL
P. 161
161
recorded and made available to all participants not later than three (3) calendar days after
the pre-bid conference.
Request for clarification(s) must be in writing and submitted to the BAC at least ten (10)
calendar days before the deadline set for the submission and receipt of bids. The BAC shall
respond to the said request by issuing a Supplemental/Bid Bulletin, at least seven (7)
calendar days before the deadline for the submission and receipt of bids
Any Supplemental Bulletin issued by the BAC shall also be posted on the website of the
procuring entity concerned, if available, and on the G-EPS.
V. Submission and Receipt of Bids
Eligible bidder shall submit their bids through their authorized officer or their duly authorized
representative (i) in the prescribed Bid Form, including its annexes, as specified in the
bidding documents, (ii) on or before the specified deadline, and (iii) in two (2) separate
sealed bid envelopes, the first containing the technical component of the bid, and second
containing the financial component of the bid.
Bid submitted after the deadline shall not be accepted by the BAC.
The first envelope (Technical Proposal) shall contain the following technical
information/documents, at least:
1) Bid security as to form, amount and validity period;
2) Authority of signing official;
3) Construction schedule and S-curve;
4) Manpower schedule;
5) Construction methods;
6) Organization chart for the contract to be bid;
7) List of contractor’s personnel (viz., project managers, project engineers, materials
engineers and foremen), to be assigned to the contract to be bid, with their complete
qualification and experience data;
8) List of contractor’s equipment units, which are owned, leased, and/or under
purchased agreements, supported by certification of availability of equipment from
the equipment lessor/vendor for the duration of the project;
9) Equipment utilization schedule;
10) Affidavit of site inspection
11) Commitment of the contractor’s bank to extend to it a credit line if awarded the
contract to be bid, or cash deposit certificate, in an amount not lower than that set by
the agency in the Instruction to Bidders, which shall be at least equal to the operating
cash flow requirement of the contract to be bid (i.e., the estimated average operating
expense for two (2) months of the contract to be bid, or ten percent (10%) of the
approved budget for the contract to be bid, whichever is less.)
12) Construction safety and health program of the contractor.
13) Certificate from the bidder under oath of its compliance with existing labor laws and
standards;
14) A sworn affidavit of compliance with the Disclosure Provision of RA 9184 in relation
to other provisions of RA 3019; and
15) Documents/materials to comply with other non-discretionary criteria and
requirements as stated in the Instruction to Bidders.
The second envelope (Financial Proposal) shall contain the following financial
information/documents, at the least;
1) Bid process in Bill of Quantities in the prescribed Bid form;