Page 156 - ADMINISTRATIVE MANUAL
P. 156

156


                   5)  Take custody of procurement documents and responsible for the sale and distribution
                       of bidding documents to interested bidders.
                   6)  Assist in managing the procurement process.
                   7)  Monitor procurement activities and milestone to proper reporting to relevant agencies
                       when required.
                   8)  Consolidate PPMPs from various units of the procuring entity to make them available
                       for review.
                   9)  Make  arrangements  for  the  pre-procurement  and  pre-bid  conferences  and  bid
                       openings.
                   10) Be the central channel of communication.

               The  head  of  the  secretariat  in  central  offices  shall  be  at  least  fifth  ranking  permanent
               employee or, if not available, a permanent official of the next lower rank; or shall be a third
               ranking permanent employee in bureaus, regional offices and sub-regional/district offices, or
               if not available, a permanent employee of the next lower rank.


               PREPARATION OF BIDDING DOCUMENTS

                                     Form and Documents of Bidding Documents

                   a)  Approved Budget for the contract;
                   b)  Eligibility Requirements;
                   c)  Instructions  to  Bidders,  including  criteria  for  eligibility,  bid  evaluation  and  post-
                       qualification,  as  well  as  the  date,  time  and  place  of  the  pre-bid  conference,
                       submission of bids and opening of bids;
                   d)  Terms of Reference (TOR), for consulting services;
                   e)  Scope of work;
                   f)  Plans and technical specifications;
                   g)  Forms of Bid, Price Form, and list of goods or bill of quantities;
                   h)  Delivery Time or Completion Schedule;
                   i)  Form, Amount and Validity Period of Bid Security;
                   j)  Form and Amount of Performance Security and Warranty; and
                   k)  Form of Contract, and General and Special Conditions of Contract

                                              Detailed Engineering for the
                                        Procurement of Infrastructure Projects

               No  bidding  and  award  of  contract  for  infrastructure  projects  shall  be  made  unless  the
               detailed  engineering  investigations,  surveys  and  designs,  including  the  acquisition  of  the
               ROW for the projects have been sufficiently carried out and duly approved in accordance
               with  the  standards  and  specifications  prescribed  by  the  head  of  the  procuring  entity
               concerned or his duly authorized representative.

                                          PROCEDURES IN PROCUREMENT
                                              (For Infrastructure Projects)

                   a)  Pre-procurement Conference
                   b)  Advertisement/Posting
                   c)  Eligibility Screening
                   d)  Pre-Bid Conference
                   e)  Submission and Receipt of Bid
                   f)  Bid Evaluation
                   g)  Post-Qualification
                   h)  Award of Contract
   151   152   153   154   155   156   157   158   159   160   161