Gaseous Fueled Power Generation Systems
Co-Generation ● Landfill ● Biogas
i. Open I charged to J or O 019L
1. Add labor to document
2. Labor is charged to “XU”
3. This document must not be allowed to auto close as it will improperly code your
labor. This will autoclose each month incorrectly.
ii. Open I charged to J or O 018L
1. Add costs to job
2. All travel receipts do not get charged to document
3. Specific labor rates for training travel
4. No overtime charged to this document
5. Labor is charged to “XR”
b. Repair orders to outside branches
i. Open I doc charged to 262A (beginning letter is branch specific) control number is
branch specific document # you are working against.
ii. Add costs to job
1. Internal labor rates
a. Standard technician $60/hr.
b. Commissioning tech outside of project costs $100/hr.
c. Commissioning work $125/hr.
d. Reconcile all costs with branch specific administration
e. Insure all are entered as 86 Sublet item number as this specific Idoc
c. Commissioning documents
i. Innio commissioning rates:
1. Expenses at cost
2. No mileage
3. Verify labor costs are per current Innio contractual agreement.
Divisions of Penn Power Group
NES Main Office: 1 Pearl Buck Court, Bristol, PA 19007 (T) 267.878.0011 (F) 215.785.5500
WES Main Office: 499 Nibus Street, Unit B, Brea, CA 92821 (T) 714.529.9700 (F) 714.529.9701
Corporate Office: 8330 State Road, Philadelphia, PA 19136-2986 (T) 215.335.5010 (F) 215.335.2163
www.neesys.com / www.weesys.com