Page 318 - Tech handbook 2019 rev 6 whyperlinks
P. 318
Gaseous Fueled Power Generation Systems
Co-Generation ● Landfill ● Biogas
o Check the warehouse for any spills or e. Quoting, scheduling and
leaks that need that need to be addressed preparing the BOL using the
immediately online websites for LTL
shipping.
• Maintain all SharePoint documents throughout the f. Contacting MODE
day to help the parts and service team stay up to date transportation on any long
o Shipping log distance, same day, over
o Warranty case file dimensional and flatbed
o Non collected freight services needed.
o UPS investigations (when needed) • Operating the forklift in a safe manner to
load/unload any orders and to store skids on the
• Maintaining various tech supplies stock levels by racking.
doing a weekly cycle count based on the “tech • End each day with a cleanup of the warehouse.
supplies” folder on SharePoint and ordering when o Make sure all areas are free of debris
needed. Ex: which can become a tripping hazard
o LOCTITE 243 (50ML) AMAZON o Sweep each work area
o LOCTITE 510 (50ML) AMAZON o Empty trash from each workspace
o LOCTITE 524 (50ML) AMAZON o Check the warehouse for any spills or
o PERFECT SEAL (16OZ) AIRCRAFT SPRUCE leaks that need that need to be
o MOLYKOTE 55 – SKY GEEK addressed immediately
Chapter 2 ICS Database Configuration Management