Page 323 - Tech handbook 2019 rev 6 whyperlinks
P. 323

Gaseous Fueled Power Generation Systems
                                          Co-Generation ● Landfill ● Biogas



                        NES-WES Supply
                   a.     Chain.pptx
                   b.  Weekly/bi-weekly stock ordering
                          ▪  Inventory is classified as either Stock, Non-Stock, or Minimum
                          ▪  Stocked Parts:
                                 •  A reorder point calculation utilizing average lead time, average daily use, lead time
                                     demand, maximum lead time, maximum daily use, a safety stock calculation, ABC
                                     categorization, an EOQ, among other metrics, a part # and qty for order is determined.



                                      Supply Planning
                                 •      Report.docx
                          ▪  Minimum Parts:
                                 •  SCM reviews parts that do not meet the stocking criteria but should be included in our
                                     inventory.
                                 •  Parts that are needed in stock are tagged and ordered weekly.

            4.  Inventory Reporting
                   a.  Fill Rates
                   b.  Cartage Recovery
                   c.  Inactive Inventory
                   d.  Safety Spares
   318   319   320   321   322   323   324   325   326   327   328