Page 323 - Tech handbook 2019 rev 6 whyperlinks
P. 323
Gaseous Fueled Power Generation Systems
Co-Generation ● Landfill ● Biogas
NES-WES Supply
a. Chain.pptx
b. Weekly/bi-weekly stock ordering
▪ Inventory is classified as either Stock, Non-Stock, or Minimum
▪ Stocked Parts:
• A reorder point calculation utilizing average lead time, average daily use, lead time
demand, maximum lead time, maximum daily use, a safety stock calculation, ABC
categorization, an EOQ, among other metrics, a part # and qty for order is determined.
Supply Planning
• Report.docx
▪ Minimum Parts:
• SCM reviews parts that do not meet the stocking criteria but should be included in our
inventory.
• Parts that are needed in stock are tagged and ordered weekly.
4. Inventory Reporting
a. Fill Rates
b. Cartage Recovery
c. Inactive Inventory
d. Safety Spares