Page 31 - SE Annual 2018.indd
P. 31

Stonecrest Annual 2018                                                        Page 31 / 38

Agricultural
        Project

   Highlights
        in 2018:

Completed Projects

      Stonecrest has always been        WALKER BRAE FARMS,                    community to tour their new
fortunate to provide engineering        GUELPH, ONTARIO (above)               facility at an open house in June
 to a vast number of agricultural                                             2018.
                                        In 2017, the Walker Family started
              business owners and       construction on their new free        INNLAWN FARMS, EMBRO,
 contractors. We have designed          stall dairy facility at their farm    ONTARIO (below)
  thousands of facilities over the      near Guelph, Ontario.
past decade throughout Ontario                                                The McCorquodale Family recent-
                                        With completion in early 2018,        ly celebrated with an open house
       and most recently into the       the facility housed 180 cows in       on their new dairy compost pack
                 Atlantic Provinces.    a 4-row, sand-bedded, free stall      facility in October, 2018.
                                        barn with a centre drive through
  Our projects have ranged from         feed alley. Features also include     With all the cows under one roof,
      commodity and equipment           a 2x10 Turner vertical lift parallel  this 120’ x 378’ Britespan barn
                                        milking parlour with basement         houses 2 GEO Monobox Robots
   structures to complex robotic        area and a Jamesway gutter cat        with free flow traffic with post
   and rotary dairy facilities. We      cross gutter system, which moved      sorting gates, GEA FRone Feed
                                        manure into their new 140 foot        Pusher and alley scrapers. Inside
      have witnessed progressive        diameter liquid manure storage        the barn is also a second floor
  changes in barn and operation         tank.                                 area with a large office and view-
  design for an array of livestock                                            ing area.
                                        The Walker’s welcomed the
                 and dairy facilities.

     We have note a few projects
                           from 2018.
   26   27   28   29   30   31   32   33   34   35   36