Page 5 - Gary John Oliphant - CV
P. 5

June2010  – September  2012
                                                 The  $680m  Nation  Towers  development  in  Abu  Dhabi  –
                                                 UAE,  constructed  on  Corniche  Road  West  and  represented
                                                 by  International  Capital  Trading.  The  complete  project  is
                                                 composed  of  a  development  in  two  blocks.  The  South  block
                                                 which  has  a  ground  surface  area  of  38,644  square  meters
        Resident  Engineer  –                    and  the  North  block  which  has  a  ground  surface  area  of
        (Electrical  Services)                   14,565  square  meters.  The  electrical  Total  Connected  Load
        KEO International                        (TCL)  of  the  project  is  around  35  MW.  The  South  Block
        Abu Dhabi, United  Arab Emirate          includes  a  high-rise  mixed-use  development  composed  of  2
                                                 basement  parking  levels,  a  four-level  podium  including
                                                 parking  mezzanines,  drop  offs  and  lobbies  for  each  tower
                                                 component,  as  well  as  hotel  public  function  areas,  meeting
                                                 rooms,  retail  space and  the  St  Regis  Hotel  Spa and outdoor
                                                 pool  with  terrace,  tower  1  and  tower  2.  Tower  1  has  one
                                                 component,  including  58  levels  of  residential  lofts.  Each  of
                                                 these  floors  has  four  2  storey  lofts  and  5  single  storey  loft
                                                 units for a total of 14 units every 2 floors. Tower 2 has two
                                                 components, including 27 levels of Office space of Core and
                                                 Shell Leased Office and 17 levels of Hotel rooms and suites.
                                                 Level 52 of Tower 1 and Level 48 of Tower 2 are joined by a
                                                 sky-bridge.  The  total  built  area  of  the  South  Block  is
                                                 301,360  square  meters.  The  North  Block  includes  a  natural
                                                 land  development  composed  of  2  restaurants,  bar,  gym,
                                                 pool,  pool  deck,  beach  area,  changing  rooms,  function
                NATION TOWERS                    areas, deck, cabanas and children’s  crèche area.



                                                                                          July  2008 – June  2010
                                                 The  $120m  Ferrari  World  Theme  Park  in  Abu  Dhabi  -  UAE,
                                                 constructed  on  Al  Yas  Island,  and  represented  by  ALDAR,
                                                 hosts  the  Abu  Dhabi  Grand  Prix  each  year  during  its  world
                                                 circuit  tour.  The  contract  involves  the  construction  of
                                                 around  300,000  square  meters  of  usable  area,  which
                                                 includes  the  East  West  hotel,  a  welcome  pavilion,  four
        Deputy  Project Director  –              areas  or  multi-storey  parking  C1-C4,  a  shopping  mall,  Yas
        (MEP Services)                           Marina  hotel  and  the  Ferrari  World.  The  electrical  Total
        Bond Communications                      Connected  Load  (TCL)  of  the  project  is  around  38  MW.  The
        Dubai, United  Arab Emirates             project  represents  the  first  phase  of  the  Al  Yas  Island
                                                 Development  in  a  growing  neighbourhood  around  Abu
                                                 Dhabi.


        Ferrari World


        Theme Park
   1   2   3   4   5   6   7   8   9