Page 22 - Rpt Anderson SW18 5RS_Neat
P. 22
Survey Report Contents Overview Services Internal External Total Est. Costs 19
Loft Access & Insulation
Loft access Insulation
Fitted Ladder: No Insulation: Yes
Boarded: No Type: Glass Fibre
Lighting: Yes Thickness: 270mm
Details / Defects / Issues: At the time of the inspection no visible defects were observed.
The loft is accessed via the landing. The loft space is insulated to current standards. Old doors have been laid across
the ceiling joists and are used for partial access.
Further information on all aspects of insulation, including advice on choosing a reputable contractor, is
available from the National Insulation Association and can be found via the link below:
www.nationalinsulationassociation.org.uk
Further information can be obtained with regard to energy saving via the links below:
www.est.org.uk
www.cat.org.uk
www.ecocentre.org.uk