Professional Practice: Guideline for Quantity Surveyor                                                     Chapter 5



                   5.8.12  Bills of Quantities

                   Bills of quantities are provided to facilitate the contractor to make an estimate.It contains
                   elements that are involved in the building.When make estimation, it will consider:

                            Material cost including transportation and wastage

                            Machinery cost.
                            Labour cost
                            Transportation cost

                            Profit.
                          The  BQ  for  building  works  is  based  on  the  Standard  Method  of  Measurement

                   (SMM)  book  issued  by  Royal  Institution  of  Surveyor  Malaysia  (RISM).  For  civil
                   engineering  work,  is  based  on  Malaysian  Civil  Engineering  Standard  Method  of
                   Measurement (MyCESMM) book issued by CIDB.