Page 69 - be'ah Annual Report
P. 69

Material Flow at the Reuse Center   Construction and Demolition (C&D)



            Construction and demolition (C&D) waste is           for processing C&D waste and allocating several
 Internal Process in Reuse Center  one of the most voluminous waste generated.   sites across the sultanate for the purpose.
            Therefore, be’ah stressed on developing plans
 •  Drop off shops
 •  Pick up services  Sort  Set in order  Fix  Standardise  Sustain  •  Charity shops
 •  Charity shops  •  House emptying services  •  Reuse shops (2+30)
 •  Reuse shops  •  Transfer stations    •  Online sales channel
 •  Households  •  SQU unwanted items  •  Buffer before sorting  Operational sites and 2020 planned sites
 •  Sorting line
 •  Cleaning / Repair
 •  Buffer before sales
 Collection  Pick Up Logistics  Sale Platforms  C&D sites: 21 Operational  C&D sites: 4 Planned in
                                                                           2020 goals


                Al Dakhliyah (Nizwa, Samail, Bahla, Izki, Adam)   Mirbat
                Al Batinah (Barka, Al Rustaq, Saham, Sohar,       Mudhaibi
 Recycle - Commercialization   Suwaiq, Khaboura, Musanah, Liwa, Shinas)  Ibra
 of Waste Streams  Al Sharqiya (AlKamil, Jalan bani bu Ali, Sur)  Musandam


 be’ah sees environmental and economic potential   these with the objective of having a system in place   Al Dhahirah (Ibri)
 in commercializing waste streams such as   for waste collection at source, its transportation   Muscat (Al Amerat)
 Construction and Demolition Waste (C&D), End   and identifying an attractive market for the
 of Life Tires (ELT), Lead Acid Batteries (LAB), green   private sector to invest in a processing facility.    Buraimi
 waste, Waste Electrical and Electronic Equipment   Dhofar ( Raysut )
 (WEEE) and End of Life Vehicles (ELV). It is in the
 process of developing an integrated system for

            Current Quantity of Construction and Demolition
            Waste and Processed/Treated Quantities



 Plastic Waste

                  Total C&D Waste at Facilities                  Total C&D Waste Processed in 2019
 End of Life    Construction
 Vehicles   and Demolition

                  3955904.56 tonnes                              754,747.20 tonnes
 Waste Streams
 Development and
 Commercialization

 Waste Electrical   End of Life Tires
 and Electronic
 Equipment   End of Life Tires (ELT)





 Lead Acid Batteries   Green Waste   End of Life Tires are tires that are no longer suitable   developed management plan for ELT stream
            for use on vehicles due to wear or damage. be’ah     comprising of the collection and processing of ELT.

 68                                                                                                              69
   64   65   66   67   68   69   70   71   72   73   74