Page 68 - be'ah Annual Report
P. 68

Material Flow at the Reuse Center                                                                                      Construction and Demolition (C&D)



                                                                                                                                   Construction and demolition (C&D) waste is           for processing C&D waste and allocating several
                                                              Internal Process in Reuse Center                                     one of the most voluminous waste generated.          sites across the sultanate for the purpose.
                                                                                                                                   Therefore, be’ah stressed on developing plans
                              •  Drop off shops
                              •  Pick up services     Sort  Set in order  Fix  Standardise  Sustain  •  Charity shops
              •  Charity shops  •  House emptying services                                       •  Reuse shops (2+30)
              •  Reuse shops  •  Transfer stations                                               •  Online sales channel
              •  Households   •  SQU unwanted items                  •  Buffer before sorting                                      Operational sites and 2020 planned sites
                                                                     •  Sorting line
                                                                     •  Cleaning / Repair
                                                                     •  Buffer before sales
         Collection               Pick Up Logistics                                                  Sale Platforms                               C&D sites: 21 Operational                        C&D sites: 4 Planned in
                                                                                                                                                                                                   2020 goals


                                                                                                                                       Al Dakhliyah (Nizwa, Samail, Bahla, Izki, Adam)   Mirbat
                                                                                                                                       Al Batinah (Barka, Al Rustaq, Saham, Sohar,       Mudhaibi
             Recycle - Commercialization                                                                                               Suwaiq, Khaboura, Musanah, Liwa, Shinas)          Ibra
             of Waste Streams                                                                                                          Al Sharqiya (AlKamil, Jalan bani bu Ali, Sur)     Musandam


             be’ah sees environmental and economic potential     these with the objective of having a system in place                  Al Dhahirah (Ibri)
             in commercializing waste streams such as            for waste collection at source, its transportation                    Muscat (Al Amerat)
             Construction and Demolition Waste (C&D), End        and identifying an attractive market for the
             of Life Tires (ELT), Lead Acid Batteries (LAB), green   private sector to invest in a processing facility.                Buraimi
             waste, Waste Electrical and Electronic Equipment                                                                          Dhofar ( Raysut )
             (WEEE) and End of Life Vehicles (ELV). It is in the
             process of developing an integrated system for

                                                                                                                                   Current Quantity of Construction and Demolition
                                                                                                                                   Waste and Processed/Treated Quantities



                                                        Plastic Waste

                                                                                                                                         Total C&D Waste at Facilities                  Total C&D Waste Processed in 2019
                                       End of Life                      Construction
                                       Vehicles                         and Demolition

                                                                                                                                         3955904.56 tonnes                              754,747.20 tonnes
                                                 Waste Streams
                                                 Development and
                                                 Commercialization

                          Waste Electrical                                        End of Life Tires
                          and Electronic
                          Equipment                                                                                                End of Life Tires (ELT)





                                        Lead Acid Batteries         Green Waste                                                    End of Life Tires are tires that are no longer suitable   developed management plan for ELT stream
                                                                                                                                   for use on vehicles due to wear or damage. be’ah     comprising of the collection and processing of ELT.

      68                                                                                                                                                                                                                                69
   63   64   65   66   67   68   69   70   71   72   73