Page 73 - PPAP submission requirements (PPAP check sheet)
P. 73
Form 10.2.2
MOTHER PLANT MINE MODEL_______M001____________ INSPECTION STANDARD DATE 28/1/2020 PAGE 3 OF 6
PRE-CHECK PART NO. PART NAME FINISHED
DATE / / UNFINISHED
49404-A0010-A TRAY-TOOL-KIT
CASTING FORGING
ROUTE SUPPLIER MATERIAL GENERAL TOL. WEIGHT
THAI EPP FOAM CO., LTD. 295 ± 29.5 g
1.1 Datum Point
MMR PRE-CHECK
DATE / /
MINE
PRE-CHECKED
DATE / / Datum l,ll (L,W) Datum lll (H)
COPY NO.
MINE Issue DATE REVISION RECORD SUPPLIER
28/1/2020 New adoption ( ECIXXXX )
0
GENERAL MANAGER ENGINEER MINE MOBILITY CORPORATION CO., LTD (MMC) GENERAL MANAGER ENGINEER
MANAGER MANAGER
SUPPLIER DEPT. THAI EPP FOAM CO., LTD.
Rev.1 on 6 Dec 19
SQAM - 11-3