Page 74 - PPAP submission requirements (PPAP check sheet)
P. 74

Form 10.2.2

           MOTHER PLANT    MINE     MODEL_______M001____________ INSPECTION STANDARD DATE  28/1/2020  PAGE     4    OF         6
           PRE-CHECK    PART NO.                     PART NAME                                    FINISHED
           DATE       /       /                                                                   UNFINISHED
                                 49404-A0010-A                       TRAY-TOOL-KIT
                                                                                                  CASTING FORGING
                        ROUTE                        SUPPLIER        MATERIAL       GENERAL TOL.  WEIGHT

                                                     THAI EPP FOAM CO., LTD.                   295 ± 29.5 g
                        1.2 Measuring Point





           MMR PRE-CHECK
           DATE       /       /















           MINE
           PRE-CHECKED      INSPECTION ITEM  INSPECTION INSTRUMENT  INSPECTION CRITERION RANK  SAMPLING  Customer  REMARK (INSPECTION METHOD)
                                                                                  PLAN  SAMPLING PLAN
           DATE       /       /  Point 1 - 16   Taper gauge       3 ± 3.0   B N=3pcs. / Lot

















             COPY   NO.


























                        GENERAL MANAGER  ENGINEER  MINE MOBILITY CORPORATION  CO., LTD (MMC)                   ENGINEER
                        MANAGER

                                             SUPPLIER DEPT.    THAI EPP FOAM CO., LTD.
                                                                                                Rev.1 on 6 Dec 19
                                                                                                  SQAM - 11-3
   69   70   71   72   73   74   75   76   77   78   79