Page 74 - PPAP submission requirements (PPAP check sheet)
P. 74
Form 10.2.2
MOTHER PLANT MINE MODEL_______M001____________ INSPECTION STANDARD DATE 28/1/2020 PAGE 4 OF 6
PRE-CHECK PART NO. PART NAME FINISHED
DATE / / UNFINISHED
49404-A0010-A TRAY-TOOL-KIT
CASTING FORGING
ROUTE SUPPLIER MATERIAL GENERAL TOL. WEIGHT
THAI EPP FOAM CO., LTD. 295 ± 29.5 g
1.2 Measuring Point
MMR PRE-CHECK
DATE / /
MINE
PRE-CHECKED INSPECTION ITEM INSPECTION INSTRUMENT INSPECTION CRITERION RANK SAMPLING Customer REMARK (INSPECTION METHOD)
PLAN SAMPLING PLAN
DATE / / Point 1 - 16 Taper gauge 3 ± 3.0 B N=3pcs. / Lot
COPY NO.
GENERAL MANAGER ENGINEER MINE MOBILITY CORPORATION CO., LTD (MMC) ENGINEER
MANAGER
SUPPLIER DEPT. THAI EPP FOAM CO., LTD.
Rev.1 on 6 Dec 19
SQAM - 11-3