Page 76 - PPAP submission requirements (PPAP check sheet)
P. 76
Form 10.2.2
MOTHER PLANT MINE MODEL_______M001____________ INSPECTION STANDARD DATE 28/1/2020 PAGE 6 OF 6
PRE-CHECK PART NO. PART NAME FINISHED
DATE / / UNFINISHED
49404-A0010-A TRAY-TOOL-KIT
CASTING FORGING
ROUTE SUPPLIER MATERIAL GENERAL TOL. WEIGHT
THAI EPP FOAM CO., LTD. 295 ± 29.5 g
INSPECTION ITEM INSPECTION INSTRUMENT INSPECTION CRITERION RANK SAMPLING Customer REMARK (INSPECTION METHOD)
PLAN SAMPLING PLAN
2. Appearance
2.1 Shrink Visual check Not allowed C 100%
MMR PRE-CHECK 2.2 Crack
DATE / / 2.3 Shortshot
2.4 Fusion
2.5 Mix material Refer boundary sample
2.6 Feeder or Ejection pin Scale < 2.0 mm.
2.7 Burrs at P.L. Visual check NO HARMFUL
2.8 Color : BLACK Refer boundary sample
3. Weight Weight Scale 295 ± 29.5 g. B n=3, c=0 / LOT
MINE
PRE-CHECKED
DATE / /
COPY NO.
GENERAL MANAGER ENGINEER MINE MOBILITY CORPORATION CO., LTD (MMC) ENGINEER
MANAGER
SUPPLIER DEPT. THAI EPP FOAM CO., LTD.
Rev.1 on 6 Dec 19
SQAM - 11-3