Page 18 - PowerPoint Presentation
P. 18

FACT FILE








                YEAR OF CONSTRUCTION


                   1999-2001



                  COST OF CONSTRUCTION

                      Rs 5,10,61,786/-



                      LENGTH OF FLYOVER


                          450m


                       SPAN ARRANGEMENT


                             4 Span each of 25m with


                             a)     Approaches - 185m(Sai Mandir side) & 165m Wardha side.
                             b)     Ramp Gradient: 1:30



                         CARRIAGEWAY WIDTH


                               11.00m clear carriageway


                             FOUNDATION


                                  RCC Pile Foundation


                                  a)     900mm diameter piles proposed in CC (M-35)
                                  b)     Anchorage - 1.5 times diameter in rock.
                                  c)     Six piles are proposed in three group and four piles are
                                         proposed in two group.
                                  d)     Pile Cap for 4 pile group = 3.5x3.5 with 1.25m depth.
                                  e)     Pile Cap for 6 pile group = 3.5x5.75 m






                                                                                                  18
                          NAGPUR METRO RAIL CORPORATION LIMITED: A JOINT VENTURE OF
                            GOVERNMENT OF INDIA AND GOVERNMENT OF MAHARASHTRA
   13   14   15   16   17   18   19   20   21   22   23