FACT FILE
YEAR OF CONSTRUCTION
1999-2001
COST OF CONSTRUCTION
Rs 5,10,61,786/-
LENGTH OF FLYOVER
450m
SPAN ARRANGEMENT
4 Span each of 25m with
a) Approaches - 185m(Sai Mandir side) & 165m Wardha side.
b) Ramp Gradient: 1:30
CARRIAGEWAY WIDTH
11.00m clear carriageway
FOUNDATION
RCC Pile Foundation
a) 900mm diameter piles proposed in CC (M-35)
b) Anchorage - 1.5 times diameter in rock.
c) Six piles are proposed in three group and four piles are
proposed in two group.
d) Pile Cap for 4 pile group = 3.5x3.5 with 1.25m depth.
e) Pile Cap for 6 pile group = 3.5x5.75 m