DEMOLITION PROCESS












                                           The Chhatrapati Bridge was supported on Mushroom
                                           shaped pier which were constructed cast-in situ. For
                                           the demolition of these piers, diamond cutter was
                                           used. The diamond cutter is strong enough to cut
                                           both the reinforcement and the concrete. The pier
                                           was cut at two location along its length and then
                                           tilted on the ground with the help of excavators. It is
                                           den broken down into smaller pieces with the help
                                           of rock breaker