DEMOLITION PROCESS






     The demolition process along with being a speedy one also ensured that minimal damage to
     the environment was made. For this, during the demolition process as the dust was created,
     dust separation was done with the help of jet fogger. The jet fogger function was spraying
     miniscule droplets of water at the place where demolition was happening. This kept the
     environment moist and the dust particles to settle down rather than flying in the air.







































      Cutting & Lowering of  The Diaphragm,  After crushing of Remaining Two Girders,
                           With Cranes And Then Crushing it on ground





                                                           After   the    removal    of   the   deck
                                                           overloading, the main deck had to be
                                                           demolished. For this, combi-crusher
                                                           equipment were used which attacked
                                                           from both the sides. The deck near the
                                                           pillar was broken first which resulted in
                                                           the rest of the cantilevered deck falling
                                                           down under concrete debris


                                                                                                  50