Control of Industrial Major Accident Hazards (CIMAH) Report   Page       19
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                                        Part B: Information on the Installation         Date        Aug 2019











































                                           Figure B.3.3b: Storage of the Drums


               B.3.4  Chlorinator Room

               Kampung Tengah 1 Water Treatment Plant

               Two (2) units of  10  kg/hr gas chlorinator  for pre-chlorination are installed. Pre-
               chlorination for algae control and intermediate chlorination is necessary only when
               iron or manganese is present in the settled water.

               Two (2) units of 10 kg/hr gas chlorinator  for post chlorination are installed.  Post
               chlorination is always dosed to disinfect  filtered water and to maintain a required
               residue in the clear water tank. Both systems will have only one as duty and one as
               standby.
               The pre-chlorination dosing rate is manually adjusted proportionally to the raw water
               inlet flow rate. The ejector installed is a manual system in the chlorinator room, and
               the dosing points  are  located at the  mixing channel after the aerator.  The post-
               chlorination dosing rate is manually adjusted according to the filtered water flow rate
               and Chlorine residual values. The ejector installed is a manual system mounted at
               the filter gallery next to the Chlorine dosing chamber.