Control of Industrial Major Accident Hazards (CIMAH) Report   Page       20
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                                        Part B: Information on the Installation         Date        Aug 2019


               Kampung Tengah 2 Water Treatment Plant

               Two (2) units of  15  kg/hr gas chlorinator for  pre-chlorination are installed. Pre-
               chlorination for algae control and intermediate chlorination is necessary only when
               iron or manganese is present in the settled water.

               Two (2) units of 15 kg/hr gas chlorinator  for post-chlorination are  installed.  Post-
               chlorination is always dosed to disinfect  filtered water and to maintain a required
               residue in the clear water tank. Both systems will have only one as duty and one as
               standby.

               The pre-chlorination dosing rate is manually adjusted proportionally to the raw water
               inlet flow rate. The ejector installed is a manual system in the chlorinator room and
               the dosing point injects chlorine directly to the raw water pipe prior to the aerator.
               The post chlorination dosing rate is manually adjusted according to the filtered water
               flow rate and Chlorine residual values. The ejector  installed is a manual system
               mounted at the contact balance tank.