Control of Industrial Major Accident Hazards (CIMAH) Report   Page       23
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                            Part C: Information Relating to the Safety Management System  Date      Aug 2019



               C.2.0 ARRANGEMENT FOR SAFE DESIGN AND SAFE OPERATION

               The arrangement made to ensure that the means provided for the safe
               operation of the industrial activity are properly designed, constructed, tested,
               operated, inspected and maintained

               This section describes the whole range of management systems or arrangements
               focusing on technical, human and organizational aspects within the organization.

               C.2.1 Design, Construction and Commissioning

               An aspect related to design, construction and commissioning of the facilities
               including the codes and standards adopted and technology applied for the
               process

               KT1  &  KT2  WTP is situated about  two (2)  km  from Segamat town. The plant is
               designed to treat 45  MLD (KT1:  13.1 MLD, KT2: 31.6 MLD) of  treated water  for
               supply to industrial and residential areas particularly within Segamat.

               Appointed Contractor who has experience in  designing and constructing water
               treatment plants was awarded the contract to design, construct and commission the
               Chlorination system. Design was carried out by  qualified engineers in their
               respective field of expertise and draw on experiences of similar design and operating
               plant  around the area. Quality systems were in placed to ensure that the design,
               construction and commissioning adheres to agreed standards.

               Design Standards

               The Chlorine gas piping conforms to the Chlorine Institute requirements for Class I
               and Class IV (gas or liquid, pressure: vacuum to 150 psig), temperature: -29°C to
               149°C.  The chlorinators, vacuum regulator/automatic changeover unit and  leak
               detectors are ensured to be supplied by reputable suppliers from Australia as their
               equipment are designed and  manufactured in conformance to  Chlorine Institute
               guidelines. Other components of the chlorination systems are designed according to
               the Chlorine Institute guidelines for equipment used for handling Chlorine and ASME
               standards.

               Construction
               Equipment such as instrument control systems, valves and  fittings were sourced
               from approved reputable manufacturers.  Piping is  welded or joined by certified
               welders and  pipe  fitters. Quality of the  fabricated piping is checked with the