Control of Industrial Major Accident Hazards (CIMAH) Report   Page       27
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                            Part C: Information Relating to the Safety Management System  Date      Aug 2019


               Any non-routine  activities such  as repair and service of plant  equipment, start-up,
               and shutdown of system or equipment, will subject to permit to work or proper risk
               assessment including a pre-job briefing by work supervisor.

               The Company will conduct safety induction to all employees and contractors on the
               safety procedure, prevention, and mitigation measure before starting the work.

               The objectives of the induction are:
                       -  Provide details related to rules and regulation when entering the plant’s
                          premise
                       -  Usage of mandatory and proper PPE
                       -  Provide guidance during emergency

               C.2.3.1 Operation Control Procedure – Chlorine

               Chlorine Drum Fitting
                   a)  Workers are advised to wear a full chlorine gas face mask with the cartridge
                       filter before starting the task.
                   b)  Remove the drum cover and reposition the drum where the valve is position
                       upright. The top valve will release chlorine gas and the bottom valve release
                       liquid chlorine.
                   c)  Loosen up the nut cover for the top valve and remove it manually.
                   d)  During the loosen up of the nut cover, a gas leak test will be conducted by
                       using the ammonia solution. Gas leakage can occur when the drum valve is
                       not securely tightened. Tighten up the spindle valve if leakage is detected.
                   e)  Install a custom connector on the drum. Make sure the coupling is dry and
                       clean. Use a new gasket each time when making a connection.
                   f)  Tighten up the nut and perform gas leak tests by using the ammonia solution.
                   g)  Close the valve. If no gas leakage is detected, the chlorine drum is ready to
                       be used.

               Chlorination Operation

               There are  four (4) chlorinators installed in  both KT1 & KT2  Chlorination  Room
               whereby two chlorinators are dedicated for Pre-Chlorination and two chlorinators for
               Post Chlorination.

               Apart from the built-in automatic control system of the chlorinators and the automatic
               drum valve shut  off system (Chlorguard), the Chlorination Room control systems
               also has the following features:

                   •  Control Features