Control of Industrial Major Accident Hazards (CIMAH) Report Page 29
Ranhill SAJ Sdn. Bhd. Revision 01
Part C: Information Relating to the Safety Management System Date Aug 2019
means possible. All the maintenance records will be safely kept and monitored and
subject to periodical review to ensure any common deviations to be managed to
avoid potential failure.
The following safety-critical equipment/elements have been identified and subject to
maintenance and inspection regime by the appropriate parties.
No Safety-Critical Equipment / Element Standard Checker
Active Fire Fighting System
MS 1489: PART 1: 1999
1 Fire Hydrant Contractor
BS 5041: Part 1: 1987
2 Fire Water Ring Main MS 1489: PART 1: 1999 Contractor
3 Fire Sprinkles MS ISO 6182-1: 2000 Contractor
4 Fire Hose Reel BS EN 671: 1995 Contractor
5 Fire Reel Hose BS EN 694: 1994 Contractor
6 Portable Fire Extinguisher MS 1539: Part 1: 2002 Contractor
7 Fire Alarm Panel MS 1745: Part 3: 2004 Contractor
8 Manual Call Point Break Glass MS 1745: Part 11: 2004 Contractor
Passive Fire Fighting System
UBBL 1984
1 Fire rated chlorine store Contractor
NFPA 221
Unfired Pressure Vessel
ASTM A-285
1 Chlorine Drum BS1500 Contractor
ASME Sect VIII
2 Chlorine Cylinder JIS B 8421 Contractor
Emergency Response Equipment
1 Self-contained breathing apparatus (SCBA) Manufacturer Standard Contractor
2 Chlorine Gas Detector Manufacturer Standard Contractor
Process System