Control of Industrial Major Accident Hazards (CIMAH) Report   Page       33
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                            Part C: Information Relating to the Safety Management System  Date      Aug 2019


               The Company maintenance  performance is monitored periodically as far as
               practicable. Non-routine  or unplanned  maintenance  tasks are subject to hazard
               analysis and risk management processes.

               C.2.5 Safety Audit and Inspection Programs

               Internal OHMS Audit Procedure (SAJ-IMS-P-44) to ensure Safety and Health
               performance in RSAJ is generally evaluated by internal audit activities where cross
               audits are held among the site. With the assistance of the external consultant, the
               company has developed their Internal Safety Audit programme to carry out safety
               audits once a year since the company operated as Syarikat Air Johor.

               The Management System  auditing techniques (extracted  from  Safety Manual) are
               used to  facilities the examination of internal practices and procedures  that are
               essential parts of the operating environment. These examinations address only the
               physical aspects of safety and  health in the workplace.  The  main objective  is to
               minimize accidents and risk through systematic audit activities.

               The  audits  apply to every workplace within the RSAJ  organization. Among  those
               identified workplaces  are all water treatment plants, workshops  and RSAJ offices.
               The audit program will be led by the Safety and Health Manager with the assistance
               of Safety and Health Committee members. An audit report is produced after each
               audit exercise.

               C.2.6 Management of Change

               Management  of Change procedure (SAJ-HSE-P-30) are in place to  ensure any
               modification work at the plant and its equipment meet RSAJ requirements. Currently
               the personnel in charge for modification of changes in the installation is the Plant
               Superintendent/district M&E Superintendent.

               C.2.6.1 General Change

               Plant and  system modification, whether  temporary or permanent, is a continuous
               activity to:
                    •   Meet the latest Occupational Safety & Health standards;
                    •   Maintain or improve the reliability and availability of the facility;
                    •   Increase the quantities of products of production in the event of an increase
                        in demand; and
                    •   Reduce the costs of operating and maintaining the facility.