Control of Industrial Major Accident Hazards (CIMAH) Report   Page       32
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                            Part C: Information Relating to the Safety Management System  Date      Aug 2019


               Procedures are in place to verify that new, replacement or repaired equipment meets
               the specifications and requirements of  the  facility. Appropriate controls are
               implemented to  ensure personnel safety when working on or near  the plant and
               equipment being tested, cleaned, serviced, repaired or altered.

               Maintenance of the equipment is carried out by the M&E Section. The M&E Section
               is under the responsibility of the  Section  Head. A Maintenance Executive, who
               reports to the  Section Head, is in charge of the  eight districts. A dedicated
               maintenance  team  for District of Segamat is responsible  for the  maintenance
               activities at KT1 & KT2 WTP. The maintenance management system is documented
               in the ISO 9001:2000 Operation Manual under Preventive Maintenance Procedure
               (SAJ/OM/PEN/ME/01). The activities of the maintenance management system can
               be grouped into:
                   •  Planned Maintenance
                       -  Preventive maintenance; and
                       -  Scheduled maintenance.
                   •  Unplanned Maintenance
                       -  Breakdown maintenance; and
                       -  Emergency maintenance.
                   •  Verification and Calibration

               A yearly planned maintenance schedule for equipment at the water treatment works
               is prepared and used by the M&E Section. The schedule specifies the frequency of
               maintenance for the different equipment. As part of the maintenance management
               system, the M&E Section staff refers to  a  Planned Maintenance Job Card  for the
               equipment.  The Job Card lists down the work to be carried out  during the
               maintenance. After completion of work, a record is  made in the Job Card. The
               completed Job Card is then filed at the maintenance office for future references.

               Verification and calibration of electronic equipment is also scheduled. The chlorine
               leak detector sensors are scheduled for calibration once every six (6) months and
               the preventive maintenance for chlorine system and scrubber system is every three
               (3) months.

               Equipment registered with the Department of Occupational Safety and Health
               (DOSH) in compliance with the Factories  and Machinery Act 1967  are inspected
               according to  the required duration.  These include  pressure vessels and overhead
               cranes.