               D 3.2.2 Process Containment

               As  Chlorine  is  stored  in  drum  which  has  been  subject  to  calendar-based  yearly
               qualification inspection and testing, the drum is deemed as fit for storing Chlorine.
               The  Chlorine  drums  that  are  attached  to  the  process  on-duty  or  on  standby  are
               equipped  with  automatic  isolation  valves  to  shut  off  the  source  in  the  event  of
               chlorine leak. Besides the integrity of the chlorine drum as primary containment, the
               kerb for the chlorine drum storage provides the secondary containment to hold the
               leaked gas as to minimise further dispersion.

               D 3.2.3 Ignition Control

               Open  flames  or  other  sources  of  ignition  are  not  permitted within  the  chemical
               storage area as well as smoking. Chlorine cylinder or drum stored away from any
               other combustible material and potential source of ignition. Chlorine is a known as a
               gas that could enhance fire.

               Lightning protection installed with complete earthing system covering the whole plant
               / facility.

               D 3.2.4 Protection System

               The  plant  /  facility  is  serviced  by  emergency  lights,  emergency  exits,  fire
               extinguishers  and  fire  door  constructed  as  per  BOMBA  requirements.  This  is
               reflected  in  the  plant  fire  certificate  which  is  subject  to  Malaysia  Fire  &  Rescue
               Department (JPBM) yearly inspection and audit.

               The  firefighting  system  is  reflected  in  the  plant/facility  emergency  layout  plan  and
               posted at the plant.

               D 3.2.5 Detection System

               Gas  Detector  System  is  installed  in  the  Chlorine  Room  to  detect  the  presence  of
               leakage of Chlorine gas inside the room. Once detected, the alarm will be triggered
               to alert the personnel on-site. The chlorine gas detector is positioned and mapped
               accordingly to ensure sufficient detection coverage within the chlorine storage area.

               D 3.2.6 Shutdown System

               Automatic shutdown system or automatic isolation valves has been installed into the
               Chlorine dosing process system. The isolation valve attached to the drum connection
               will reduce the chances of chlorine leaks.