Page 295 - E:\CloudStation\Project\1 DONE\Ranhill CIMAH\Flip Book\
P. 295

Control of Industrial Major Accident Hazards (CIMAH) Report   Page       20
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                                  Part D: Information on the Potential Major Accident   Date        Aug 2019


               D 3.2.7 Emergency Response

               The facility/plant has established the emergency response plant which is aligned with
               the  Malaysia  Fire  Service  (Fire  Certificate)  Regulations  2001,  Uniform  Building  by
               Law 1984, and section 18, 19 of the CIMAH regulations.

               The  emergency  response  plan  is  based  on  tier  approaches  and  incident
               management  system  (IMS)  addressing fire  and  explosion hazards  within  the  plant
               and offsite.

               i.    Firefighting Resources

               The  facility/plant  has  been  equipped  with  the  firefighting  resources,  facilities  or
               equipment to combat emergency incidents as per BOMBA requirements.

                ii.   Communications

               All  on-site  personnel  and  visitors/suppliers/contractors/clients  entering  the
               location/operation  shall  be  informed  of  evacuation  procedures  during  their  site
               induction.

               All personnel in the premise is informed of the evacuation routes, nearest assembly
               points and familiarized with the sound of the evacuation siren.

               A  list  of  emergency  contact  numbers  of  external  organizations  and  related
               government authorities are available and posted at strategic locations of the plant.

               iii.   Assembly Area

               The  purpose  of  the  assembly  area  is  to  assemble  all  personnel  in  one  area,  to
               enable a head count to be conducted to determine if all personnel are accounted for.

               Both  KT1  &  KT2 WTP  designated  with  two  assembly  points  to  ensure  that  in  the
               event of one of the assembly points being unusable due to the emergency, another
               safe assembly point is available.

               Company Emergency Response Plan is provided in Part C, Appendix C3.

               D 3.2.8 Lifesaving

               Lifesaving  equipment  includes  equipment  and  appliances  that  protect  human  life
               during  emergency.  The  facility/plant  is  equipped  with  the  standard  personnel
   290   291   292   293   294   295   296   297   298   299   300