Page 8 - B8773-AEW-XX-XX-PP-A-0001_[P8]_Contractors Manual
P. 8

Ref.                      Section                                            Revision Date



        4.4                       Gas                                                30 May 2018
        4.4.1                     Gas Installation                                   3 September 2018
        4.4.2                     Gas Safety Check                                   30 May 2018

        4.5                       Other Systems                                      30 May 2018
        4.5.1                     Computer Installations                             30 May 2018
        4.5.2                     Fire Fighting Equipment                            3 September 2018
        4.5.3                     Fire Alarm                                         3 September 2018
        4.5.4                     Telephone system                                   3 September 2018
        4.5.5                     Security System                                    3 September 2018
        4.5.6                     CCTV                                               3 September 2018
        4.5.7                     Validator safe                                     3 September 2018
        4.5.8                     Door Bells                                         3 February 2016


        4.6                       Drainage and Piped Services                        30 May 2018
        4.6.1                     Hot Water                                          30 May 2018
        4.6.2                     Cold Water                                         3 September 2018
        4.6.3                     Sink Waste                                         3 February 2016
        4.6.4                     Thermostatic Blending Valve                        3 February 2016


        4.7                       Ventilation and Air Conditioning                   30 May 2018
        4.7.1                     Overview                                           30 May 2018
        4.7.2                     Extract System                                     30 May 2018
        4.7.3                     Fresh Air Supply                                   3 September 2018
        4.7.4                     Fresh Air Heating                                  3 February 2016
        4.7.5                     Mechanical Extract to Toilets                      3 February 2016
        4.7.6                     Mechanical Extract to Internal Rooms               3 February 2016
        4.7.7                     Air Filtration                                     3 September 2018
        4.7.8                     Air Conditioning                                   30 May 2018
        4.7.9                     Testing and Completion                             3 February 2016
        4.7.10                    Typical Compressor Details                         3 September 2018
        4.7.11                    Acoustic Housings                                  3 September 2018
   3   4   5   6   7   8   9   10   11   12   13