Page 95 - B8773-AEW-XX-XX-PP-A-0001_[P4]_Contractors Manual
P. 95
controls of heating, cooling and ventilation A F T
4.6.9 Testing and Completion
Upon completion of the installations, all must be
fully tested and proved, including airflows. The
Contractor must produce an Operating and
Maintenance Manual containing:
• details of all equipment supplied,
• a record drawing of the complete
mechanical services installation
• copies of all Test Certificates.
• Maintenance Schedules based on the
manufacturer’s recommendations
D R
For projects in England and Wales, the HVAC
contractor shall also demonstrate compliance
with Building Regulations Approved Documents
L2A & L2B. This will include:
• Provision of details of the efficiency and
systems in accordance with the Non-
Domestic Heating, Cooling and Ventilation
compliance Guide (2006).
• Provision of commissioning certificates
including air leakage test on the ductwork.
The contractor shall provide a typical 12
months spare filters for mechanical supply air
installations.
4.6.9 Testing and Completion 3 February 2016