Page 375 - Installation Training Binder FIT1-3
P. 375
Step 5
Assembling Barrier Walls
Make sure floor is clear of any debris. Assemble Barrier Walls and corner
extrusion as shown (Figure 9a). Grooves on Barrier Wall must face the
inside of containment barrier. Slide the lip on each corner extrusion into the
corresponding groove on the Barrier Wall (Figure 9b). Adjust Barrier Walls
so that liner fits flush against walls.
Figure 9a Figure 9b
Continue to slide Barrier Walls as shown in Figure 10 and per the CAD Diagram.
Figure 10
EnviroGuard 800-206-9884 Fax 909-624-1772 www.EnviroGuard.com
03/01/2017 Rev. G Hawk System Setup Instructions 12