Page 12 - Contractor Guidelines (VMC-4626)
P. 12

CONTRACTOR PREͲJOB MEETING

               Project Location: _________________________          Date: ________________

              Vulcan Project/Site Supervisor:
              ____________________________________________

                  Ƒ  Assign Vulcan representative
                  Ƒ  Contractor must assign a site supervisor
                  Ƒ  Contractor/ subͲcontractor must be added to the Contractor Registry
                  Ƒ  ContractorͲOperations ManagementͲProject ManagerͲSHE Dept
                      telephone contact list.
                  Ƒ  Incident & injury reporting
                  Ƒ  Emergency reporting & evacuation plan
                  Ƒ  Contractor (visitor) daily signͲin sheet.
                  Ƒ  Discussion of contractor safety & health requirements handbook.
                  Ƒ  Identify/discuss specific potential hazards during meeting.
                  Ƒ  Review MSHA Part 46 safety training plan requirements
                  Ƒ  Safety training documents for each contractor employee
                  Ƒ  PPE requirements
                  Ƒ  Equipment preͲpost shift inspections
                  Ƒ  Work area examinations / inspections
                  Ƒ  Seatbelts requirement
                  Ƒ  Adequate lighting (if applicable)
                  Ƒ  Electrical LOTO and/or electric arc flash policy (if applicable)
                  Ƒ  Crane policy (if applicable)
                  Ƒ  Contractor rigging certification (if applicable)
                  Ƒ  Fall protection (if applicable)
                  Ƒ  Confined space program (if applicable)
                  Ƒ  Hot work program (if applicable)
                  Ƒ  Discuss and provide copies of VMC product SDS’s
                  Ƒ  Environmental considerations (hrs. of operation, noise, sensitive
                      neighbor issues, dust, odors, spills, etc.)
                  Ƒ  Storage and use of hazardous materials (petroleum products including
                      fuel, chemicals, etc.)
                  Ƒ  Address any additional concerns by the contractor




               12