Page 152 - Binder
P. 152

Nomination Recognition 2017


        Report by Cross Functional Team

       CATEGORY:         CROSS FUNCTIONAL TEAM AWARD

       PROJECT:          CL1 Validation Team

       CATEGORY:        GREAT COLLABORATION

       NOMINATOR:       Matthew Kasayka
       SPONSOR:

       LEADER:

       PROFILE:
       Describe the situation or event related to the individual's or team's performance.
       During the Validation process, the group of individuals worked closely with one
       another through difficult situations to achieve their goal.


       The team members worked tirelessly for long hours through extreme late August
       temperatures outside at the CL1 Loading station while carrying heavy equipment.


       The team was asked to work long hours to complete their task, including outside
       their scheduled hours.  They traveled back and forth from Lippman  Campus to
       Wooster for extended periods and on short notice.


       The Team kept their composure when times got tough and problems arose.  During
       the first Cleaning Validation using Safewater Sanitizer the process failed.   They
       went on to use Safewater Cleaner and Sanitizer, which then failed as well.  With a
       Production deadline looming close at hand, modifications were made quickly to the
       cleaning process.  The process included reverting the cleaning solution from the
       pump back into the building to re-circulate the cleaner.    This allowed the use of
       Safewater Cleaner and Sanitizer to pass the Cleaning Validations needed in order
       to start Production on CL1.

       Describe in detail the individual's or team's notable behaviors.
        The group worked together in synchrony with a can do attitude to accomplish the
        goal of validating the equipment.   They drove themselves to succeed without any
        outside influence, and overcame obstacles.

       What were the results of the individual’s or team’s behaviors?
        By working as a dedicated unit, the Validation process was completed on time to
        allow for Finished Goods production from CL1 on Sept 6th 2017.


       NOMINEE                           DEPARTMENT

       Michael Battle (979)              Quality Assurance 204100

       Thomas Brazil (4532)              Cleaning & Sanitization 201300
       Jessica Smeltzer (4934)           Cleaning & Sanitization 201300

       Michael Thomas (5318)             Cleaning & Sanitization 201300


      rptCrossFunctionalTeamNominations                                           Tuesday, February 13, 2018  152
   147   148   149   150   151   152   153   154   155   156   157